IT Infrastructure

Complete infrastructure — from network cable to disaster recovery.

Full IT setup for new offices, network design and deployment, business firewall and security, storage architecture, virtualization, and backup & disaster recovery. Everything below the application layer.

Typical engagement

New office setup, in five phases.

Most infrastructure projects follow this shape. Timeline depends on scope — a small office setup might be 2 weeks; a 50-seat operation might be 6-8 weeks.

PHASE 1

Site survey & requirements

Onsite visit. Document floor plan, headcount, workflow, existing equipment, compliance needs. Free for business enquiries in Ahmedabad service area.

PHASE 2

Design & proposal

Written proposal — network diagram, equipment BOM, licenses, timeline, milestone-based pricing. Vendor options where multiple make sense.

PHASE 3

Cabling & hardware

Structured cabling install, patch panel and rack setup, switch/firewall/AP installation, server rack build. Physical infrastructure first.

PHASE 4

Configuration & go-live

Network configuration, VLAN setup, firewall rules, server OS install, backup configuration, workstation provisioning. Then user testing and go-live.

PHASE 5

Documentation & handover

Complete network diagram, IP scheme, credentials vault, backup schedules, licensing register, warranty details. Handed over — you own your infrastructure.

ONGOING

AMC or Managed IT

Most deployments transition into AMC or managed IT — continuous coverage, preventive maintenance, and direct Priority Support Line for urgent issues.